Change Load Date

Production within SuiteMaker is based on organising orders into production batches called Loads. Each load has a production date for all the items within it.

This form allows you to change that production date and affect the Production Plan and Load Sheets.

Data Technologies Ltd, Gothic House, Barker Gate, Nottingham, NG1 1JU, United Kingdom

www.suitemaker.com Tel +44 (0)845 89 00 660 info@suitemaker.com

Return To The Previous Page