|
|
Change Load Date
Production within SuiteMaker is based on organising orders into production batches called Loads. Each load has a production date for all the items within it.
This form allows you to change that production date and affect the Production Plan and Load Sheets.
Data Technologies Ltd, Gothic House, Barker Gate, Nottingham, NG1 1JU, United Kingdom
www.suitemaker.com
Tel +44 (0)845 89 00 660
info@suitemaker.com
|